Step 1. Check the waiting box (size, verticality, perpendicular) |
Before starting the installation, it is necessary to check and determine the size of the cell to be in line with the approved drawing. |
Step 2. Install the enclosure |
Check the detailed drawings, check the door direction: open left or right; use specialized materials and equipment to assemble the frame together. |
Step 3. Install the door |
Attach the hinge to the wing then hang the wing onto the frame. |
Step 4. Install the accessories |
Measure and locate the lock & other door accessories according to the approved design drawing, then install the lock & accessories.
|
Step 5. Install only the cover & amp; just block |
Insert only the enclosure between the wall and the nail enclosure with nails, attach the stopper to the enclosure with nails, and check the completion of all doors.
|